- 0:00Speaker 1: So a data center campus takes two to three years
- 0:02Speaker 1: to build. A grid interconnection request, getting a new data
- 0:05Speaker 1: center actually connected to the electrical grid, takes four to
- 0:09Speaker 1: 10 years. This is a massively important gap and a
- 0:13Speaker 1: number in AI infrastructure right now. And most people who
- 0:17Speaker 1: think they're positioned for AI, they haven't touched it, they
- 0:19Speaker 1: haven't thought about it, okay? So here's the chain that
- 0:21Speaker 1: I've been thinking a lot about lately, okay? And this
- 0:24Speaker 1: is the actual bottlenecks that determine whether AI can scale
- 0:28Speaker 1: and why I think the investors who win the next
- 0:30Speaker 1: five years are the ones who are focused on the
- 0:33Speaker 1: infrastructure underneath the infrastructure okay so let me show you
- 0:37Speaker 1: how big this has has gotten okay so according to
- 0:40Speaker 1: the international energy agency's april 2026 report global data center
- 0:45Speaker 1: electricity consumption is on track to hit 1100 terawatt hours
- 0:50Speaker 1: in 2026 alone that's roughly equivalent to japan's entire entire
- 0:54Speaker 1: national electricity consumption in a single year and this is
- 0:58Speaker 1: just for data centers we're talking about and ai focus
- 1:01Speaker 1: facilities are growing electricity demand approximately three times faster than
- 1:06Speaker 1: conventional data center infrastructure. The IEA projects data center power
- 1:11Speaker 1: demand goes from 31 gigawatts in 2025 to 66 gigawatts
- 1:17Speaker 1: by 2027. For some context here, U.S. data center consumption
- 1:20Speaker 1: already equals roughly the combined generating capacity of all U.S.
- 1:25Speaker 1: nuclear power plants. It's insane. The chips got built, right?
- 1:29Speaker 1: The buildings are being constructed. What can't keep up is
- 1:34Speaker 1: the infrastructure that's needed to literally power them. So here's
- 1:37Speaker 1: the framework that I'm using when I look at something
- 1:39Speaker 1: as big as the AI trade, right? Everyone knows AI
- 1:43Speaker 1: is going to be large. We know that. There's no question.
- 1:45Speaker 1: That's priced in, right? The opportunity isn't in identifying the AI,
- 1:49Speaker 1: that AI is big. It's identifying what prevents AI from
- 1:53Speaker 1: from becoming as big as people think it will be.
- 1:56Speaker 1: The bottlenecks, where are they? The physical constraints of this,
- 1:59Speaker 1: the things that the market hasn't repriced yet because they're boring,
- 2:03Speaker 1: they're unglamorous. When I look at AI, the bottleneck chain
- 2:06Speaker 1: looks like this, okay? Obviously, semiconductors were the first bottleneck, right?
- 2:11Speaker 1: Everybody rushed for chips, right? That story ran hard and
- 2:15Speaker 1: still runs hard, right? Then data centers, right? You need
- 2:18Speaker 1: somewhere to put the chips, right? That's the building right now.
- 2:23Speaker 1: But the constraints that are genuinely hard to solve fast,
- 2:26Speaker 1: the ones that take years, years and years, regardless of
- 2:29Speaker 1: how much money you just keep throwing at the problem,
- 2:32Speaker 1: these are the ones higher up the chain. So let's
- 2:34Speaker 1: talk about them. Let's talk about cooling. This is the
- 2:36Speaker 1: cooling constraint. A traditional server rack uses somewhere between 5
- 2:40Speaker 1: and 15 kilowatts of power. A modern AI optimized rack
- 2:45Speaker 1: uses between 30 and 110 kilowatts. A single NVIDIA chip
- 2:47Speaker 1: rack draws 120 to 130 kilowatts. Deloitte estimates next-gen AI
- 2:50Speaker 1: racks could reach 370 kilowatts in 2026. Air cooling, the
- 3:00Speaker 1: standard design used in data centers for absolute decades, is
- 3:03Speaker 1: effectively obsolete for those power densities. The heat output from
- 3:08Speaker 1: an AI rack is comparable to literally industrial machines. Liquid cooling, though,
- 3:13Speaker 1: direct to chip systems, immersion cooling, is the engineering answer.
- 3:17Speaker 1: but it requires completely different infrastructure than what most existing
- 3:21Speaker 1: facilities were built with. They're not prepped for it. The
- 3:24Speaker 1: cooling build out is happening, but it's a big constraint
- 3:28Speaker 1: on how fast AI capacity can move and how fast
- 3:31Speaker 1: it can be deployed, not just how many chips are available. Next,
- 3:35Speaker 1: the power constraint. Individual AI data center sites are requesting
- 3:40Speaker 1: 100 to 750 megawatts of power each from regional grids
- 3:44Speaker 1: that weren't built. They just weren't built to absorb demand
- 3:47Speaker 1: on that kind of short notice. That's the power consumption
- 3:50Speaker 1: of a literally small city from a single campus. Cooling
- 3:54Speaker 1: alone accounts for roughly 40% of all data center electricity.
- 3:58Speaker 1: The facilities that house the most powerful AI systems in
- 4:02Speaker 1: the world are, to a significant degree, elaborate cooling machines
- 4:07Speaker 1: that also run ships. Grid constraints. This is a big bottleneck.
- 4:12Speaker 1: Nearly 2,300 gigawatts of generation and storage capacity are currently
- 4:17Speaker 1: sitting in interconnection queues in the United States, okay? They're
- 4:21Speaker 1: literally just waiting for a grid connection. They exist, they're funded,
- 4:25Speaker 1: the electricity can be generated, but the process of formally
- 4:30Speaker 1: connecting to the grid, it's taking four to 10 years, right?
- 4:33Speaker 1: A data center can be built in two to three years.
- 4:36Speaker 1: Grid interconnection takes twice as long at minimum. That timeline
- 4:40Speaker 1: gap is the structural constraint that doesn't get solved by
- 4:43Speaker 1: just building another chip fabrication plant or announcing another data
- 4:48Speaker 1: center campus, okay? The grid can be upgraded, obviously. Transmission
- 4:52Speaker 1: lines can be built. But these are multi-year capital, very capital-intensive, regulatory-intensive,
- 4:59Speaker 1: physical infrastructure project, right? This is not software. This is
- 5:02Speaker 1: not a GPU release cycle. This is literally physical constraints. Copper,
- 5:06Speaker 1: all right? Every piece of this chain needs copper. Electrical
- 5:10Speaker 1: wiring and data centers, cooling system piping, grid transmission infrastructure,
- 5:15Speaker 1: EV charging networks that share grid capacity with other data centers,
- 5:19Speaker 1: the build out of renewable energy generation, solar, wind, those
- 5:25Speaker 1: utilities are deploying to meet data center demand. Copper is
- 5:28Speaker 1: literally in all of them. The specific mining and processing
- 5:32Speaker 1: side of that demand is its own subject, but the
- 5:35Speaker 1: connection between AI infrastructure growth and physical commodity demand is
- 5:40Speaker 1: a huge relationship that most tech-focused investors they haven't even
- 5:44Speaker 1: incorporated into their portfolios or into their frameworks or even
- 5:47Speaker 1: to their thought process. The AI trade that most people
- 5:50Speaker 1: are in is the application and the chips. Both are
- 5:53Speaker 1: obviously amazing. Both have significant price movements, right? I'm in
- 5:57Speaker 1: them myself. But the layer that's increasingly the actual constraint
- 6:02Speaker 1: on AI scaling is the physical stuff, the infrastructure underneath
- 6:05Speaker 1: this stuff, power availability, grid capacity, cooling system, literally physical
- 6:10Speaker 1: materials like copper being the most prominent in my opinion
- 6:14Speaker 1: that tie all of this stuff together, right? Look, this
- 6:17Speaker 1: isn't a contrarian bet against AI, no, right? It's a
- 6:20Speaker 1: more complete picture of what AI actually requires to exist
- 6:23Speaker 1: at scale. The IEA data is clear, electricity demand from
- 6:26Speaker 1: AI-focused facilities is projected to triple by 2030 that tripling
- 6:31Speaker 1: doesn't happen in buildings with air-cooled racks plugged into you
- 6:34Speaker 1: know grid designed in 90 grid designs in 1980 okay
- 6:37Speaker 1: the investors who benefit from that tripling may not be
- 6:40Speaker 1: the ones who correctly predicted you know which ai llm
- 6:44Speaker 1: or model becomes the standard they may be the ones
- 6:46Speaker 1: who really understood what had to be built for any
- 6:50Speaker 1: model to even run I think about this a lot.
- 6:52Speaker 1: I think about this the same way that I think about,
- 6:54Speaker 1: you know, a real estate development. You can build beautiful houses, right?
- 6:58Speaker 1: But if the road to it isn't paved, the property
- 7:02Speaker 1: isn't worth what it looks like on paper, okay? The
- 7:04Speaker 1: chips are the house. The data centers are the rooms,
- 7:08Speaker 1: the grid, the power, the cooling, the copper. Those are
- 7:11Speaker 1: the roads. And the roads are four to 10 years
- 7:14Speaker 1: behind the buildings, right? I'm not positioned purely in this
- 7:18Speaker 1: thesis fully yet. I own SOXX heavily for semiconductor exposure
- 7:22Speaker 1: and Cuckoo gives me my broad participation in the large
- 7:25Speaker 1: AI platform companies. But when I think about where I
- 7:28Speaker 1: want to add over these next few years and few months,
- 7:31Speaker 1: it's really a lot towards this infrastructure layer, right? Not
- 7:34Speaker 1: just chasing what's already ran. If you want to learn
- 7:37Speaker 1: a scalable options trading strategy built for busy people, busy professionals,
- 7:41Speaker 1: not full-time traders, that's exactly what I teach in a
- 7:43Speaker 1: completely free pay-to-wait course. it's 21 lessons long completely for
- 7:48Speaker 1: free no strings attached i'll leave it as a second
- 7:50Speaker 1: link in the description of today's video two questions as
- 7:52Speaker 1: always for you guys when you think about your current
- 7:54Speaker 1: ai exposure are you positioned in the application layer the
- 7:58Speaker 1: chip layer or have you thought about the power and
- 8:01Speaker 1: grid and physical material layer at all in your portfolio
- 8:05Speaker 1: and the grid interconnection timeline four to ten years to
- 8:08Speaker 1: connect a new site Was that longer than you expected?
- 8:12Speaker 1: Because that number to me, in my opinion, it is
- 8:14Speaker 1: seriously the most underappreciated constraint in this entire AI build-out narrative.
- 8:18Speaker 1: Let me know down below in the comments and make
- 8:20Speaker 1: sure to pick up that free course for yourself. You're
- 8:21Speaker 1: absolutely going to love it. I've had incredible feedback from
- 8:24Speaker 1: it for you guys. It's going to show you how
- 8:25Speaker 1: to collect your very first premium from your portfolio. Click
- 8:27Speaker 1: the second link down below the description of today's video. Remember,
- 8:30Speaker 1: sell options, collect premiums, repeat. I'll see you all tomorrow.